Pilot Project 1

Achievement Details

Pilot Project 1

The project was conducted at Rivière-au-Renard in November 2016 on a 2.25 MVA power transformer installed on a 7’ x 7’ concrete base. This is an experimental wind turbine for the Gaspe Wind Farm Technical Centre (TechnoCentre Éolien de Gaspé). The collaboration of TechnoCentre Éolien staff was essential and greatly appreciated.

Specifications
Project Date :
1 novembre 2016
Company Name :
TechnoCentre Éolien de Gaspé
Location :
Rivière-au-Renard