Installation

Following the site assessment, the appropriate equipment and options according to the specific requirements shall be determined. The next step is to coordinate the installation using all gathered information and plans.

Installation of the DRH4 can be conducted by the customer, following specific guidelines with supervision from Voltra technology, unless or otherwise, a legal agreement is made between the two parties.